
Working below the surface
Water and sewer alignments have to allow for existing services and connections at the edges of the road. The point where a buried line crosses a street affects excavation and reinstatement.
Infrastructure

Field portfolio
A paving crew and a pipe crew look at the same street differently. One works to the finished surface. The other follows the services beneath it. The sequence matters to both.

Water and sewer alignments have to allow for existing services and connections at the edges of the road. The point where a buried line crosses a street affects excavation and reinstatement.
The civil works bring the trench, road base and paving back to the required level. On a built-up street, access to neighbouring properties is part of the brief.